Description:The project consists of three buildings with common underground car parks. It will be a corporate office center that will include leasable office space, built to suit operations offices for the ECQ, a commercial banking operations building with trading floor, program amenities for tenants and public users, a computer data center and 3 levels of below grade parking.
The project is composed in a multi-structure campus configuration, including three primary office buildings linked together via an enclosed atrium streetscape.
MEP Project Description :
HVAC system mainly consists of 10 no. Air Cooled Chillers each 340 tons, supplying Data Centers and electrical rooms located in the buildings. Heat Exchangers connected to Marafiq supplying basement lobbies and offices areas. Ventilation system with car park exhaust fans, smoke and pressurization fans.
Plumbing - Water Supply system mainly supplied by municipality water along with collection tanks and filtration tanks according to Green Building LEED V2 consisting of City water tank 94 m3 , feeding clear water tank, fire tank and filtration tank. Clear water tank 56.4 m3 supplying lavatories. Riser of rain water pipes collected into irrigation tank 56.4 m3. Filtration tank 47 m3, supplying Building 1, 2 and 3 as WC ,UR’s flushing.
Plumbing - Drainage System designed subject to Green Building LEED V2 mainly consisting of Riser of waste pipes from the lavatories collected into filtration station. Domestic water tank supplying Building 1, 2 and 3. Riser of soil pipes from WC, UR’s and FD collected into the sewerage network.